100% inspection before shipment
Materials Report Hardness test report
Salt spray test report Dimension Inspection Report
CMM Test Report FAI first inspection report

Whole process quality assurance
We believe that only a perfect process is an effective means to ensure quality

Strictly manage the supply chain
Both self-operated and cooperative suppliers must comply with the quality management system; strict control of material and surface treatment suppliers.

Control the production process
Your parts will be processed in strict accordance with the established technological process; and mass production can be carried out after FAI report passing; Inspection all the way to ensure that each process is correct.

Professional engineer review process
The process engineer is responsible for reviewing the drawings, communicating with you about the optimizaton of your parts and eliminate the problems before processing.

100% full inspection shipment
Hyluo has a professional quality inspection team to ensure the quality of the parts; 100% full inspection of the processed parts before delivery. Make sure your requirements are met.
CNC Machining Testing Equipment




Production Process
→ Turning and related operations
→ Drilling and related operations
→ Milling and other machining operations
→ Grinding operations
→ Other abrasiveprocesses
→ Mechanical energy processes
→ Electrochemical machining
→ Thermal energy processes
→ Finished products inspection
→ Chemical machining